Drainage built into the foundation. Sloped to the center drain.

Concrete Patio Foundation & Center Drainage in Hammond, LA.

See how it came together
Before and after photographsThe patio area before construction and after the concrete foundation was installed. The photographs were taken from different positions.Open before photographOpen after photograph
Explore the project

Where it
started.

SCS Roofing and Concrete installed a concrete foundation for a planned enclosed patio in Hammond, Louisiana. The entire patio slab slopes toward a center drain. Proper drainage was imperative because the space was intended to be enclosed. The project began with lawn beside an existing covered patio.

See the work
underway.

Before the pour, the prepared area had perimeter forms, steel reinforcement and the center drain rough-in in place. SCS installed the concrete foundation and the connecting walkway beside the home.

A closer look at the work.

Plan for drainage before the pour

The center drain rough-in is visible inside the reinforcing grid. This was the collection point for the patio slab’s inward slope.

The completed foundation

The finished concrete extends the area beside the existing covered patio and connects to the walkway along the home. This case study documents the foundation stage of the planned enclosure. The patio foundation was installed with the entire surface sloped toward the center drain.

  • Concrete foundation for a planned enclosed patio
  • Entire patio slab sloped toward a center drain
  • Perimeter forms, steel reinforcement and center-drain rough-in documented before the pour
  • Connecting concrete walkway shown after completion

Materials documented: Concrete, Steel reinforcement

Hammond, LA

City-level location. The homeowner’s address stays private.

Open in Google Maps

Your project.
Our responsibility.

Here’s what to expect when you work with SCS. Your project manager carries the condition, recommendation and written scope through the work.

Meet the people behind the work
  1. Inspect the condition

    Your project manager inspects the property and helps you understand what needs attention.

  2. Agree on the scope

    Review the recommendation, materials, work and price in writing before you commit.

  3. Coordinate the work

    Your project manager coordinates the work against the agreed scope and remains your point of contact.

  4. Walk the finished project

    Review the completed work with the project manager who knows its history.

Before your next concrete project.

Why was the entire patio slab sloped toward a center drain?

This concrete was installed as the foundation for a planned enclosed patio, so drainage was part of the foundation work from the start. The entire patio slab was sloped toward the center drain to give surface water a planned collection point.

What does the preparation photo show?

The project photo shows perimeter forms, a steel reinforcing grid and the center-drain rough-in before the concrete pour. It documents the work area before the finished slab covered those details.

What work did SCS complete?

SCS installed the concrete foundation for a planned enclosed patio and the connecting concrete walkway. The preparation photographs also document the perimeter forms, steel reinforcement and center drain rough-in.

Project photographs and descriptions by SCS Roofing and Concrete. View the project photo record.