SCSROOFING
& CONCRETE
HOMEOWNER WORKSHEET
Version: October 31, 2026

Estimate comparison

Roof estimate comparison

Compare three roofing proposals by roof measurements, materials, deck allowances, installation scope, and written terms.

Compare the written scope before comparing totals. Use the same project description for every contractor. Leave unknown items blank and request clarification; this worksheet does not specify the design or construction requirements for your project.

Download blank CSVRead the guide

Entries stay in this tab; this worksheet does not send them anywhere. Print or download your completed worksheet to keep it before closing the page.

1. Align the scope Give each contractor the same dimensions, use, and requested work.

2. Record differences Write “excluded” where the estimate excludes work. Do not treat blanks as included.

3. Clarify in writing Resolve allowances and unanswered questions before selecting a proposal.

Side-by-side scope

Blank fields are for your project notes.

Scope itemContractor AContractor BContractor C
Measured roof surfaceRecord roof surface area, units, and the measurement method.
Order quantity & wasteSeparate measured surface from material order quantity; record the stated waste allowance.
Tear-offRecord existing layers, removal scope, disposal, and any excluded material.
Deck repair allowanceRecord included deck repairs, per-sheet or other unit price, and approval process.
Roof covering & productCompare manufacturer, product line, color, accessories, and proposed installation system.
Underlayment & sealed deckRecord proposed materials and scope; identify whether a sealed roof deck is included.
Flashings & penetrationsIdentify new versus reused flashing, boots, walls, chimneys, and other penetrations.
Edges & attachmentRecord drip edge, edge details, starter materials, and proposed attachment scope.
VentilationCompare proposed intake/exhaust work and any related scope limitations.
Permits & inspectionsIdentify responsibility, included fees, and required inspections.
Evaluator & designationIf seeking FORTIFIED, identify evaluator involvement, documentation, and what is included.
WarrantiesSeparate product and workmanship terms; record provider, exclusions, and registration responsibility.
Disposal & site protectionCompare hauling, cleanup, landscaping protection, and final debris removal.
Changes & paymentRecord payment terms, change-order process, and how hidden damage is approved.
Total & excluded workRecord written total, allowances, exclusions, and quote expiration. Compare matching scopes.