Documentation planning
FORTIFIED documentation planner
Organize who will collect project records, where evidence will be kept, and what remains outstanding before, during, and after roof work.
Planning worksheet — not an official checklist or certification. Use the applicable IBHS requirements and your evaluator’s project-specific documentation plan. Completing this worksheet does not establish eligibility or a FORTIFIED designation.
Have the evaluator identify required evidence before work is concealed. The rows below organize responsibilities; they are not a complete list of technical requirements.
Entries stay in this tab; this worksheet does not send them anywhere. Print or download your completed worksheet to keep it before closing the page.
Before work Agree who collects each record and how the evaluator will receive it.
During work Track evidence while details are visible and flag gaps promptly.
After work Reconcile outstanding requests and retain the final records received.
Documentation tracker
Blank fields are for your project notes.
| Phase / item | Planned owner / timing | Evidence / file reference | Received / outstanding |
|---|---|---|---|
| BeforeDesignation goal & scopeAsk the evaluator which current standard, checklist, and project details apply. | |||
| BeforeDocumentation rolesName the evaluator and the people responsible for collecting and delivering evidence. | |||
| BeforeProducts & installation planRecord proposed products and methods; identify evidence needed for this project. | |||
| BeforeEvidence handoffAgree photo labels, file locations, recipients, and how missing documentation will be tracked. | |||
| DuringRoof & deck conditionsRecord evidence requested by the evaluator before relevant work is covered. | |||
| DuringDeck attachmentTrack the project-specific photos and records requested for deck attachment. | |||
| DuringSealed roof deckTrack requested material records and installation evidence before work is covered. | |||
| DuringEdges, flashings & detailsTrack evidence requested for relevant edge, flashing, and roof-system details. | |||
| DuringCovering & attachmentKeep requested product identification, installation photos, and supporting records. | |||
| DuringChanges & missing evidenceRecord scope changes and documentation questions; assign each follow-up to a person. | |||
| AfterEvidence packageList completed files and records; confirm receipt with the evaluator. | |||
| AfterOpen itemsRecord the evaluator’s outstanding requests and who will resolve each one. | |||
| AfterDesignation recordRecord the outcome and retain any designation record received. Do not assume designation from this worksheet. | |||
| AfterOwner recordsKeep relevant contracts, product records, warranty documents, and project documentation together. |
Official references: IBHS 2025 technical documents · 2025 FORTIFIED Roof Documentation Checklist (PDF).
Ask your evaluator to confirm the documents and requirements applicable to your project. This planning tool is published by SCS Roofing and Concrete and is not an IBHS form.